$1M general liability coverage
Insurance for the work on your commercial site.

Schools · Commercial Floor Coatings
Hallways, cafeterias, locker rooms and shop classrooms take thousands of footsteps a day. We plan floor coatings around your school calendar.
Insurance for the work on your commercial site.
Our small in-house team handles prep and installation.
A floor system chosen around your building and operations.







The floor at work
Hallways wear in a stripe down the middle, cafeterias take spills at every lunch, locker rooms stay wet, and shop classrooms deal with tools and chemicals. Old tile lifts, sealed concrete wears through and custodians spend hours stripping and waxing. Work must fit the calendar and leave time for setup before students return.
The complete system
We assess the concrete, daily traffic and cleaning needs before recommending the floor system. Our own crews prepare and install the floor to the agreed scope.
We measure every space, note traffic, spills and chemicals, and agree which rooms must be ready first.
We review the needs of hallways, cafeterias, locker rooms, labs and shop rooms separately.
Work is scheduled into breaks or summer, with a written timeline for each space and custodial setup.
Why trust DFW Classic
The timeline is tied to school breaks and allows time for custodial setup.
Wet and dry spaces are assessed separately for texture and cleaning needs.
Our small in-house team installs the floor, with $1 million in liability coverage.
Fast and easy
We tour with facilities, measure spaces and agree priorities.
You get a written timeline tied to the break or summer window.
The crew prepares and repairs the concrete for the selected system.
Each space gets its system in the order the timeline sets.
Facilities walks each space with us before custodial setup starts.
Straightforward pricing
Pricing begins with a free building walk alongside facilities. Square footage, repairs and system choice vary by space.
A compressed break schedule differs from a summer project. The written quote breaks the price down by space so it can be matched to budgets and approvals.
Your space can work better
Book a free building walk, and we'll fit the work to your school calendar.
Explore more
Garland-based. DFW-wide.
Our crews work out of the Garland shop and take schools projects in Garland, Dallas, Irving, Richardson, Plano, Frisco, McKinney, Allen, Mesquite and Rockwall.
See every city we serveHelpful answers
The project is planned against your summer or break window, with handover dates that leave time for setup.
A free building walk establishes square footage, repairs, system choice and schedule. The quote is broken down by space.
Worn hallways, sticky cafeteria floors, slick wet areas or lifting tile are signs to have the concrete assessed.
School floors are planned ahead around breaks. Summer work is best discussed in spring.
Wet areas and dry hallways require different finishes. We choose texture space by space, with traction where floors get wet.